Structural Engineering: Highland Hospital 3 Story Parking Structure
Description:
The project consists of a 117,000 s.f., three-story parking structure and accommodates 320 parking spaces. The parking structure is constructed on normal spread footings and utilizes cast-in-place concrete retaining walls and concrete columns to support the elevated parking decks. The parking decks are cast-in-place, post-tensioned concrete slabs.
Total Construction Cost: $6,000,000
Owner:
Highland Hospital
1000 South Avenue
Rochester, New York 14620
Architect: